Paint and Process Building

  • Paint and Process Building
  • Paint and Process Building
  • Paint and Process Building
  • Paint and Process Building

Paint and Process Building

Airway Heights, WA
Customer: WEMCO Manufacturing
Date Completed: October 2014

This large pre-engineering structure encompasses 60,000 sf of structural steel for the WEMCO Manufacturing Inc., Paint & Process building. Built to house two 100 metric ton cranes it is sheeted in pre-insulated steel panels on both the roof and the walls. This project also features a radiant heat flooring system; a 12" thick Hydronic Heat floor slab spanning the entire first floor of the main building. Connected to one side of the main warehouse, is a 4,650 sf 2-story office space, which also features the insulated panel cladding.